全文获取类型
收费全文 | 268篇 |
免费 | 94篇 |
国内免费 | 10篇 |
出版年
2023年 | 4篇 |
2022年 | 7篇 |
2021年 | 5篇 |
2020年 | 11篇 |
2019年 | 3篇 |
2018年 | 8篇 |
2017年 | 16篇 |
2016年 | 20篇 |
2015年 | 15篇 |
2014年 | 23篇 |
2013年 | 24篇 |
2012年 | 21篇 |
2011年 | 24篇 |
2010年 | 13篇 |
2009年 | 18篇 |
2008年 | 18篇 |
2007年 | 19篇 |
2006年 | 22篇 |
2005年 | 24篇 |
2004年 | 16篇 |
2003年 | 8篇 |
2002年 | 8篇 |
2001年 | 10篇 |
2000年 | 13篇 |
1999年 | 7篇 |
1998年 | 10篇 |
1997年 | 1篇 |
1995年 | 2篇 |
1994年 | 1篇 |
1991年 | 1篇 |
排序方式: 共有372条查询结果,搜索用时 15 毫秒
141.
This paper finds the optimal integrated production schedule and preventive maintenance plan for a single machine exposed under a cumulative damage process, and investigates how the optimal preventive maintenance plan interacts with the optimal production schedule. The goal is to minimize the total tardiness. The optimal policy possesses the following properties: Under arbitrary maintenance plan when jobs have common processing time, and different due dates, the optimal production schedule is to order the jobs by earliest due date first rule; and when jobs have common due date and different processing times, the optimal production schedule is shortest processing time first. The optimal maintenance plan is of control limit type under any arbitrary production schedule when machine is exposed under a cumulative damage failure process. Numerical studies on the optimal maintenance control limit of the maintenance plan indicate that as the number of jobs to be scheduled increases, the effect of jobs due dates on the optimal maintenance control limit diminishes. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007 相似文献
142.
Ryusuke Hohzaki 《海军后勤学研究》2007,54(1):46-58
This paper deals with a two‐person zero‐sum game called a search allocation game, where a searcher and a target participate, taking account of false contacts. The searcher distributes his search effort in a search space in order to detect the target. On the other hand, the target moves to avoid the searcher. As a payoff of the game, we take the cumulative amount of search effort weighted by the target distribution, which can be derived as an approximation of the detection probability of the target. The searcher's strategy is a plan of distributing search effort and the target's is a movement represented by a path or transition probability across the search space. In the search, there are false contacts caused by environmental noises, signal processing noises, or real objects resembling true targets. If they happen, the searcher must take some time for their investigation, which interrupts the search for a while. There have been few researches dealing with search games with false contacts. In this paper, we formulate the game into a mathematical programming problem to obtain its equilibrium point. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2007 相似文献
143.
In this paper, we study a m‐parallel machine scheduling problem with a non‐crossing constraint motivated by crane scheduling in ports. We decompose the problem to allow time allocations to be determined once crane assignments are known and construct a backtracking search scheme that manipulates domain reduction and pruning strategies. Simple approximation heuristics are developed, one of which guarantees solutions to be at most two times the optimum. For large‐scale problems, a simulated annealing heuristic that uses random neighborhood generation is provided. Computational experiments are conducted to test the algorithms. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2007. 相似文献
144.
There has been much research on the general failure model recently. In the general failure model, when the unit fails at its age t, Type I failure (minor failure) occurs with probability 1 ? p(t) and Type II failure (catastrophic failure) occurs with probability p(t). In the previous research, some specific shapes (constant, non‐decreasing, or bathtub‐shape) on the probability function p(t) are assumed. In this article, general results on some probability functions are obtained and applied to study the shapes of p(t). The results are also applied to determining the optimal inspection and allocation policies in maintenance problems. © 2006 Wiley Periodicals, Inc. Naval Research Logistics, 2007 相似文献
145.
It is generally recognized that the first model involving job scheduling was presented by Selmer Johnson and published in the inaugural issue of Naval Research Logistics Quarterly (NRLQ) in 1954. NRLQ also published another seminal scheduling paper by Wayne E. Smith a short time later. In the present paper, we discuss the contribution of NRLQ and the role of the Office of Naval Research in the development of the scheduling literature during the first decade (1954–1963). We also provide a critical analysis of the papers by Johnson and Smith. © 2015 Wiley Periodicals, Inc. Naval Research Logistics 62: 335–344, 2015 相似文献
146.
147.
148.
149.
吴欣妍 《武警工程学院学报》2014,(6):75-77
网络技术在教育教学当中的应用是深化教育体制改革、扎实推进教育公平的重要措施,也是对适应我国教育教学活动实际的教学模式的研究和重要探索。分析了网络技术辅助教学相比传统教学所具有的优势,并从开发和应用两方面对网络辅助教学进行阐述,同时展望了网络技术的发展前景及其对未来教育的影响。 相似文献
150.
定义了装甲装备器材库存超(欠)储的概念,提出了维修保障资源点器材储存状态的定性判别和量化方法;考虑数量、时间、空间等影响因素,提出了资源点维修器材超(欠)储程度的评价指标和评价方法,并结合某军区实际数据进行了验证。结果表明:资源点的平均超(欠)储程度反映了保障体系内所有资源点库存偏离正常水平的平均程度,可为确定调剂资源点的优先次序和供应数量提供依据。 相似文献